Sunday, April 22, 2012

Back to work on the Shed

After a bout of poor weather and illness, Jack and I are back on the shed.  Put siding on 2 walls yesterday, and discussed what we will do with the 5th wall ( the one with the double doors ).

so, here's some photos:

As I mentioned in the last Shed post, Jack is making windows.  here's the outer and inner boxes for one of the windows.  Jack debated whether to hinge them so they would open or just screw the inner box into the outer box as a fixed window.  I think I have him talked into hinges.  The window here is just placed in the outer box for the photo.



One of the 5' sidewalls, with siding on.  for the window, we used the skillsaw to cut the siding exactly to the edge of the framing for the window, and used a craftsman 18.9v sawsall to clean up the corners, as the skill would have cut part of the studs if we ran it all the way to the corner.



The "other" back wall.  here the two 10' back walls have been sided.  we are close to putting walls up.  Maybe Sunday.

The project space, walls and such all strewn about.  We have one 5' wall to put siding on, then we stand up the walls and attach them to each other with headerboards, and attach them to the shed foundation.




No comments:

Post a Comment